Fujairah Control Building

Project Location

Fujairah, UAE

Client Timeline

14 Months

Project Status

Completed On Time

From concept to creation, we bring your vision to life:

Partnering with a leading global energy group, UGCE was selected for the detailed design of the new ADNOC Control Building in Fujairah, UAE. In collaboration with ADNOC/Archirodon Constructions (Overseas), our team delivered a comprehensive and meticulously planned design, encompassing the full architectural, structural, and MEP scope. Our work included producing all necessary calculation sheets and detailed material take-off (MTO) lists, a testament to our precision and unwavering commitment to engineering excellence. This project highlights our ability to turn our clients’ bold visions into reality, even within the complex and rapidly evolving energy sector.

Project Timeline and Workflow

A specialized, cross-functional team of architects, engineers, and project managers was assembled to oversee the project. The workflow was strategically structured into parallel phases to optimize efficiency and minimize project timelines.

Months 1–4: Design and Technical Documentation
Conceptualization and preliminary design
Full architectural, structural, and MEP design
Creation of detailed calculation sheets and technical reports
Months 5–8: Verification and Procurement Support
Rigorous design verification and quality assurance
Preparation of precise material take-off (MTO) lists
Months 8–12: Construction Supervision and Coordination
On-site construction technical support
Multidisciplinary coordination to resolve on-site issues

The Result

We delivered a fully completed, state-of-the-art control building, a testament to our team’s ability to execute a complex project on time, within budget, and beyond expectations.